Fleurus

Construction of a multimodal footbridge at the Fleurus station. This is part of a bridge over the tracks for which Van Eycken Metal Construction manufactured and installed a total of 170 tonnes of steel structure (one footbridge, three lift structures, three steel stairwells and two buildings).