Boorsem – viaduct E314

The viaduct between Belgium and the Netherlands has been renovated. The old structure was preserved but does not have the strength of modern concrete. Our recently developed model, the SBC Max-L, ensures the lowest possible force on the old bridge beams.
The railings were also updated to the safer and standardized Flemish region railing.