
TR H2L-Hstep
Transition between SBC Max-L H2 / SBC Max-L H4b and HeleStep
In consultation with the customer, and in accordance with EN 1317 and PTV 869, a safe and aesthetic connection is developed for each project, depending on the traffic situation.




